Seoul Mayor criticizes ministry over delayed Namsan cable car monopoly reform
Seoul Mayor Oh Se-hoon criticized the Ministry of Land, Infrastructure and Transport on November 10, 2026, for delaying amendments to an enforcement decree. According to reports from various news outlets, the Mayor expressed his frustration via Facebook, suggesting that the ministry's delay in finalizing the decree makes President Lee Jae-myung a liar regarding the promised normalization of the Namsan cable car system.
The history of the Namsan monopoly
The Namsan cable car has been operated by a single entity, Korea Ropeway Industry, since 1962, according to reports. For 60 years, the operator has maintained a monopoly because previous laws allowed the service to operate without expiration dates or formal renewal procedures. This created a de facto permanent monopoly on the route.
President Lee Jae-myung has previously criticized this long-standing arrangement, calling for the normalization of the service. The President compared the 60-year monopoly to "swimming while touching the ground" and questioned why a specific individual is granted such long-term privileges. Under the revised Orbit Transportation Act, existing cable car operators must apply for re-authorization by September 18, 2027. Once an application is received, the Seoul Metropolitan Government is required to make a decision on re-authorization within 6 months.
Challenges to the Namsan gondola project
To break the monopoly and improve transport, the Seoul Metropolitan Government is promoting a Namsan gondola project. This project aims to connect Myeongdong Station to the Namsan summit and is expected to provide more than three times the hourly transport capacity of the existing cable car. However, the project faces significant regulatory and legal hurdles.
The Namsan area is largely designated as a Natural Park Zone, where current regulations limit the height of structures to 12m. The proposed gondola requires towers that exceed 30m in height. Furthermore, the construction has been halted since October 2024, according to reports, due to a lawsuit regarding changes to the urban management plan. The Seoul Metropolitan Government appealed to the Supreme Court last month after losing both the first and second instance trials regarding these plan changes.
Future outlook
The Ministry of Land, Infrastructure and Transport had announced a legislative notice for the amendment last summer, but the process has not been finalized for over a year. Even if construction of the new gondola system resumes immediately, officials expect the project to open in the second half of 2029. Until then, the delay in the enforcement decree threatens to extend the current monopoly beyond the intended reform period.
Glossary
- Namsan — Namsan Park contains a number of walking trails which connect either directly or indirectly to the tower. The area includes the South Ringway, which is used by bicyclists and buses, and the Namsan Sky Forest Trail.
- Namsan cable car — Opened in 1962, the Namsan Cable Car was South Korea’s first aerial tramway. It offers a three-minute ride from its base at the northern edge of Namsan Park to the tower.
- Supreme Court — The Supreme Court of Korea consists of fourteen Justices, including a chief justice who governs political and administrative tasks in ordinary courts. Most cases are handled by three different panels of four justices, while the chief justice presides over the 'grand bench' convened with more than two-thirds of all justices.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0